Search This Supplers Products:Development and production of asphalt mixing plantResearch and development and production of road and bridge construction maintenance equipmentDevelopment and production of recycling asphalt mixing plantConstruction waste treatment and resource utilization equipment and related spare partsInstallation and debugging of asphalt mixing plantChina LB asphalt mixing plant for road construction DG
For example, locate the reject bin,First make sure the air pressure is enough,the position of the inducti...
timeSat, 12 Sep 2020 15:08:52 GMT
There are two types for different use locations.
timeSat, 12 Sep 2020 15:06:39 GMT
1、Upper and lower overrun switch.2、Upper maintenance switch of the hot storage bin.3、Emergency stop switch of the hot storage bin control cabinet 4、Trolley stop switch of operation console .
timeSat, 12 Sep 2020 15:05:59 GMT
1、an electronic over temperature switch at the inlet of the filter.2、Computer parameters.
timeSat, 12 Sep 2020 15:05:15 GMT
When working, the outlet temperature should not be lower than 80.
timeSat, 12 Sep 2020 15:04:47 GMT
Feed port, feed end seal ring, Rap ring, discharge end seal ring.
timeSat, 12 Sep 2020 15:02:22 GMT
Correct relationship between frequency and oil pressure of frequency converter, If there is alarm signal on the touch screen, check the alarm reason .
timeSat, 12 Sep 2020 15:01:51 GMT
Two. The fuel injection valve will be blocked by foreign matters, resulting in loose closing and oil leakage during preheating .
timeSat, 12 Sep 2020 15:00:55 GMT
After stopping the production, turn the blowing knob to the blowing position, and turn it back to the production position before preheating the next production.
timeSat, 12 Sep 2020 15:00:23 GMT
Maximum, minimum pressure;Air oil ratio control screw.
timeSat, 12 Sep 2020 14:58:36 GMT
Check whether the oil pipe and air pipe are connected correctly; wiring,the position of the lance,the pos...
timeFri, 11 Sep 2020 14:50:19 GMT
After calibration, the users can get the parameters.The menu path:[System Setup]→[Scale Setup]→[Get param...
timeFri, 11 Sep 2020 14:47:57 GMT
1.Check the scale configuration.2.Check the load cell.The replacement can be used to check if the load ce...
timeFri, 11 Sep 2020 14:47:28 GMT
The Free Calibration provides access to the span calculation screen for precalibration of a scale witho...
timeFri, 11 Sep 2020 14:38:05 GMT
Powerup ZeroIf Poweruo Zero is enabled, the terminal tries to capture zero upon power uo. If Powerup Zero capture is enabled and the weight on the scale is outside of the zero capture range , the display will indicate “EEE” or “-EEE” until the weight is removed and zero is capture.Range:0%(Powerup ...
timeFri, 11 Sep 2020 14:35:52 GMT
D-TIME Start up delay time, generally set to 5-15 seconds。 O-TIME dela...
timeSat, 15 Aug 2020 15:31:15 GMT
Press the switch of CPU to “MRES” position,When the stop light flashes...
timeSat, 15 Aug 2020 14:03:27 GMT
The shielding layer of signal line shall be single ended grounded , and ...
timeSat, 15 Aug 2020 13:59:58 GMT
less than or equal to 4 ohm.
timeSat, 15 Aug 2020 09:46:01 GMT
When the three-phase 380V power supply is used, the resistance wire adop...
timeSat, 15 Aug 2020 09:40:20 GMT
1、Screw tightening of linkage parts;2、Oil level and quality of reducer ;...
timeWed, 12 Aug 2020 15:50:05 GMT
1、Bag and support of Filter;2、Oil quantity an...
timeWed, 12 Aug 2020 15:47:46 GMT
1、Track inspection of movement direction of discharge port and feeding b...
timeWed, 12 Aug 2020 10:14:34 GMT
The way of maintenance of pneumatic parts 1. Periodically clean the air f...
timeTue, 07 Apr 2020 15:17:47 GMT
1. After new machine having worked 100 hours since initial production, a...
timeTue, 07 Apr 2020 15:10:23 GMT