1. The bearing on the equipment shall be filled with lubricating grease or covered with oil filler, so as to prevent the bearing from seeping into rain and snow water and causing rust.
2. All motors and burners shall be covered with waterproof cloth to prevent snow and moisture.
3. The inside of the mixing station may become a place for rats to avoid winter, cable trough and control room need to be done a good job of rat prevention, rat board or rodenticide are needed when necessary.
4. During production, the belts need to be tensioned, and each belt needs to be adjusted to be loose after winter, so as to prevent the belt from cracking or deformation caused by thermal expansion and cold contraction.
5. To prevent agglomeration caused by moisture intrusion, the cold bin, hot bin and dust bin should be empty.
6. Do a good job of dust collector cleaning, do a good job of waterproof and leakage prevention after the installation to keep cloth bags moisture.
7. If it is a municipal station and it still have to produce after the late October, each lubricating oil for speed reducer should be replaced by the corresponding winter special oil.
Good maintenance and standard operation can not only reduce the equipment failure, but also reduce unnecessary loss, thus can greatly prolong the service life of the equipment and reduce the use cost. Such large mechanical equipment like asphalt mixing plant is most afraid of problems caused by failure which can affect the production and supply. In order to reduce the failure rate of equipment and ensure the quality of asphalt concrete, these are inseparable from the maintenance work, especially the annual maintenance before winter and equipment overhaul before construction, which are the very essential links that ensure the equipment running in good condition.