Follow us :

Another PM Asphalt Mixing Plant Has Been Erected in Russia for Better Service

time2021/07/29

Recently, another asphalt plant has been completed installation and commissioning in Russia. Our engineer and local workers spent 15 days to do this job for the equipment. Since then, the batch asphalt plant with container design made by PRIMACH is going to produce hot mixture for road construction, and the customer is very satisfied with our fast erection at site and service.
Recently, another PM asphalt plant has been completed installation and commissioning in Russia. Our engineer and local workers spent 15 days to do this job for the equipment. Since then, the batch asphalt plant with container design made by PRIMACH is going to produce hot mixture for road construction, and the customer is very satisfied with our fast erection at site and service.
PRIMACH technology making it for easier maintenance, lower power consumption, better environmental performance and the structure can be reduced noise and dust levels to a minimum. Its modular construction, makes for easy and quick installation which is a useful feature for customers. 
PRIMACH brings new life to Russia, the ties between us will be closer and closer.